The scheduled start date of this task plus its duration makes it complete after its end constraint date.

To resolve this, do one of the following:

  1. change the scheduling for this task to As Early As Possible, which will allow it to be scheduled before the end constraint of %1@,
  2. move the end constraint back to match the scheduled date of %2@, or
  3. remove the end constraint entirely.