Release Notes:

OmniPlan for Mac

What's New, Updated, or Fixed in the Latest Releases

Recent Changes

OmniPlan 3.9.1 is a minor update focused on bug fixes.

Version 3.9.1 - Wednesday, February 21, 2018

  • Outline View — Editing a task title that wraps to more than one line no longer causes the title to disappear temporarily.

Version 3.9 - Tuesday, January 30, 2018

  • Project Summary Inspector — The new Project Summary Inspector displays total project duration, effort, variance, completion %, and cost.
  • Dashboard — It is now possible to change the visible timescale for a Dashboard via the View options in the toolbar. Select a preset date range, or specify a custom range.
  • Dashboard — The Dashboard Project column is now resizable, allowing for longer project titles to be displayed. Hovering your cursor over a truncated project title also now reveals a tooltip with the full title.
  • Dashboard — Total project effort is now included in Project Stats.
  • Dashboard — The appearance of the Actual/Baseline schedule pop-up button in the Dashboard has been updated.
  • Help — OmniPlan’s Help content has been updated with explanations of the new functionality included in this release. A couple instances of out of date information and typos in the Help have also been corrected.
  • Inspector — Date options in Project Formats Inspector are now displayed in a more logical order.
  • Printing — Page Attribute options have been slightly rearranged in the Report printing dialogue.
  • Calendar View — All four corners of the Normal Hours/Extra & Off Hours controller in the Calendar View sidebar are now rounded.
  • Dashboard — A tooltip with project and task assignment information now reliably appears when hovering your cursor over resource allocation bars in the Dashboard window.
  • Dashboard — Resource list now opens full height after checking “Show Resources” in the Dashboard View Options.
  • Document Windows — Documents opened in multiple windows now re-open to correct state after they are closed.
  • Export — Fixed a bug that could cause missing date headers when exporting a project to PDF or TIFF.
  • Gantt — Off Hours schedule exceptions now display when View ▸ Non-Working Time ▸ Holidays is selected in the OmniPlan menu bar.
  • Leveling — Fixed a bug that could cause gaps in the project schedule when leveling in some specific scenarios.
  • Leveling — Addressed a bug that could cause resource assignments to appear wrong after leveling in some combinations of Resource & Resource Group assignments.
  • Localizations — “Sign Up for the Omni Newsletter” and “Intro Video” menu items are now localized.
  • Microsoft Project Export — Fixed a bug in OmniPlan’s Microsoft Project export tool that could cause cost information to export incorrectly.
  • Microsoft Project Import — Microsoft Project 2016 files no longer import with locked task dates.
  • Microsoft Project Import — Fixed a bug that could cause milestone dates to not import correctly from Microsoft Project files.
  • Monte Carlo Simulations — Monte Carlo Simulation reports now include best-case and worst-case cost values.
  • Network View — Fixed a bug that could cause unnecessary connections to draw in the Network Diagram.
  • Resource View — Addressed a bug that could cause icons in the Resource Type column to appear blurry on some displays.
  • Task Outline — Making a change in the Inspector no longer discards pending task title edits.
  • Stability — Fixed a crash that could occur when setting an end date earlier than a start date while working in Network View.
  • Stability — Addressed a crash that could occur when disconnecting an external display or enabling AirPlay to an AppleTV.